acisegypt

Electromechanical Engineering

EI-Sharqeya Sewage Treatment Plants

Country: Egypt
Between years (1992 -1998), with a total cost of L.E. 70 million, four wastewater treatment plants, each of 20,000 mV day capacity, were constructed in AlSharqeya governorate. Prof. Dr. Sameh Abd ElGawad work included the design and preparation of all working drawings and tender documents of all the four plants.

El-Sheikh Zaied water Plant

Country: Egypt
With a budget of L.E. 200 million, the water treatment plant of El-Sheikh Zaied city was constructed in the years (1998-2001). Prof. Dr. Sameh Abd El-Gawad work included design and preparation of workshop drawings of all pipelines, valves, joints and inter - connections.

El-Baraka Water Plant, Smart village

Country: Egypt
Prof. Dr. Sameh Abd El-Gawad designed the water plant which is Located in the smart village, Cairo Alexandria highway, of a total cost L.E. 14 million. His work included Workshop drawings and site supervision for El-Baraka transmission line, groundwater wells and pumping station

General Authority of Investment Building Show land

Country: Egypt
Prof. Dr. Sameh Abd El-Gawad scope of work included design, workshop drawings, and site supervision, for HVAC, firefighting, electrical network, plumbing networks. That was in year (2002 - 2004) for the new head quarter and exhibition hall for the General Authority of Investment, Located at Salah Salem St. Cairo, with a total cost L.E. 10 million for the electro mechanical works.

Laguna Vista Resort Sharm El-Sheikh

Country: Egypt
With a total cost of 15 million Egyptian pounds, the infrastructure and electromechanical systems of the Laguna Vista resort were designed and implemented in site by Prof. Dr. Sameh Abd El-Gawad, in the years (2001 2002). Our scope of work included Preparing workshop drawings for water, wastewater, firefighting, electrical, light current, and networks also preparing tender document for plumbing works, internal lighting, HVAC works, wastewater treatment, swimming pools together with site supervision

Makady Bay Meridian

Country: Egypt
The meridian Makady Bay is one of the biggest resorts on the red sea shore, of a total cost of 450 million Egyptian pounds, it shelters a 5 stars hotel, chalets, villas and shopping center, recreational facilities and distinct landscape. Consultant Eng. Ahmad Abbas scope of work included design of the desalination plant of the resort together with the infrastructure. It also included the preparation of working and shop drawings with site supervision of the constructions

Yanbou Desalination Plant

Country: Saudi Arabia
K.S.A aimed the construction of a main desalination plant to provide Yanbou city with potable water. The plant sheltered, together with the desalination facility, the electrical equipment building, control operation & maintenance building & chemical treatment building, and it works with a capacity of 2500 midday. The total cost of the plant reached 10 million American Dollars. Consultant Eng. Ahmad Abbas scope of work included the design & preparation of workshop drawings.

Nabq Touristy Resort

Country: Egypt
the village sheltered 3 hotels each 5 stars, of max. Capacity 800 rooms, 3 main swimming pools & 3 other small ones, artificial lake, employees housing & diving center, night club, services plant. Consultant Eng. Ahmad Abbas scope of work in 1998 included design & supervision of all electromechanical works including: sanitary works, firefighting system, plumbing & air conditioning for all buildings & swimming pools.

Islamic University Niger

Country: Niger
Funded by the Islamic Development Bank, the new girls' campus of the Islamic University of Niger was established in the year 2002. The new campus sheltered administrative building, four students housing buildings, library, restaurant, four colleges, one institute, two staff housing buildings & 7 Villas for higher, mosque, service building and a desalination Plant to provide potable water. Consultant Eng. Ahmad Abbas scope of work included design and preparation of working drawings for infrastructure systems, HVAC plumbing, electrical network, firefighting, irrigation and the desalination plant.

Juhayna Industrial Compound

Country: Egypt
Consultant Eng. Ahmad Abbas scope of work included the Design, Shop drawings & Construction Supervision for Water Supply & Sewage Networks, Fire-Fighting Systems, Industrial Waste Water Treatment Plant, for this factory which is located in the industrial zone of the 6th of October city with total cost of 10 million American dollars

Beni Suief Slaughter

Country: Egypt
Consultant Eng. Ahmad Abbas scope of work included the Design, Shop drawings Construction Supervision for: Water Supply & Sewage Networks, Fire-Fighting Systems, Industrial Waste Water Treatment Plant, for the automatic slaughter building for Beni Suief governorate

Golden pyramids Plaza

Country: Egypt
It is a Huge complex built on a total land area 155,000m', comprises 3 five star hotels, luxurious residential flats, commercial mall and 4 story underground garages. Prof. Dr. Shaker El-Marqaby scope of work included engineering and detailed design of plumbing and firefighting system, HVAC system, electric power supply, lighting and light current systems together with the supervision of installation and quality control for the electromechanical works including the interactive multimedia system.

First Towers at Giza

Country: Egypt
Luxurious residential tower, 5 star hotel "Four Seasons", shopping mall, Helipad and 2 underground garage stories. Prof. Dr. Shaker El-Marqaby scope of work included engineering design and construction supervision of the following: electrical, HVAC, plumbing and fire protection works. Luxurious residential tower, 5 star hotel "Four Seasons", shopping mall, Helipad and 2 underground garage stories. Prof. Dr. Shaker El-Marqaby scope of work included engineering design and construction supervision of the following: electrical, HVAC, plumbing and fire protection works.

Green Plaza

Country: Egypt
Luxurious commercial recreational center, located in Alexandria, with a total land area 86 000m2, and a total built area 750 000m2. It shelters a Hilton hotel, cinema complex with 6 screens, grand hall, fun area, and a shopping mall. Prof. Dr. Shaker El-Marqaby scope of work included design and site supervision of the implementation of electromechanical systems except escalators and elevators.

Cairo Meridian

Country: Egypt
Five star Hotel complex (870 Room) as an extension to the existing Hayaat (Meridian) hotel. Prof. Dr. Shaker ElMarqaby scope of work included engineering and detailed design of plumbing and firefighting system, HVAC system, electric power supply, lighting and light current systems; it also included revising Shop drawings and submittals.

American University in Cairo

Country: Egypt
A new Campus for the American University is built on a land lot of 1000 000 m2... Prof. Dr. Shaker ElMarqaby scope of work included engineering and detailed design for electro mechanical service (HVAC, plumbing, fire protection, lighting and small power, and light current systems) for the campus buildings.

El-Nakheil Mall Hurghada

Country: Egypt
The project is located on a land lot of 1200m2 area & total construction area 4600m2. The building consists of basement, ground floor and other floors. The basement encloses six storage areas, the ground floor shelters number of stores, while each of the other floors contains eight residential apartments. Consultant Eng. Omar Abd Al-Monem scope of work included engineering and detailed design for electrical networks and connections, together with the supervision of its implementation in site.. The structural design was made by Dr. Nasser El-Shafey

Special Mechanical Works

Country: Egypt
Eng. Samir Halim , ACIS member, is specialized in design, field studies, construction, and operation of swimming pools, artificial lakes, vapor, sauna, and massage rooms, artificial waterfalls, fountains, and various water games.